Skip to main content

Bryce Resort plans to drain lake for dam upgrades

HARRISONBURG, Va. (AP) — Bryce Resort plans to drain Lake Laura in the fall so Lake Laura Dam can be upgraded.

Bryce Resort general manager Rob Schwartz tells The Daily News-Record (http://bit.ly/1rfeCfm ) that the process of draining the lake is expected to take six to eight weeks.

After the lake is drained, the gate at the bottom of the dam’s concrete riser will be replaced. The project also includes removing sediment.

Schwartz says the resort hopes to begin draining the lake in late September to October.

The resort owns the lake and partially owns the dam. The Lord Fairfax Soil and Water Conservation District mostly owns the dam and maintains it.

The dam was built in 1971.

___

Information from: Daily News-Record, http://www.dnronline.com

Copyright 2014 The Associated Press. All rights reserved. This material may not be published, broadcast, rewritten or redistributed.

Emergency guide: What you should do to prepare for emergencies

WASHINGTON — Do you know what you'd do if an emergency hits? What if you're at work, your spouse is stuck in traffic and your children are in school? There's no way to plan for every emergency, but you can make sure you're prepared for different scenarios, including making a plan for your family and building a kit of emergency supplies.
Read Next Story