Skip to main content

Md. officials ready site of landslide for storm

BALTIMORE (AP) — Baltimore officials are working to brace a city block that caved in two weeks ago, swallowing eight cars and a streetlight, before an impending storm promising at least two inches of rain.

Officials say crews have been dispatched to 26th Street in Charles Village to install a raised barrier to divert rain water from the site of the May 1 landslide. Crews are also securing plastic sheeting over the lip of the slope and temporarily sealing drill holes to prevent flooding.

The city block collapsed during a storm that delivered five inches of rain to some parts of Baltimore. Residents were evacuated, and have not yet been permitted to return to their homes. Some residents have blamed neglect, not inclement weather, for the street collapse.

Copyright 2014 The Associated Press. All rights reserved. This material may not be published, broadcast, rewritten or redistributed.

Emergency guide: What you should do to prepare for emergencies

WASHINGTON — Do you know what you'd do if an emergency hits? What if you're at work, your spouse is stuck in traffic and your children are in school? There's no way to plan for every emergency, but you can make sure you're prepared for different scenarios, including making a plan for your family and building a kit of emergency supplies.
Read Next Story